Blade upgrade campaign

Delivering local technical services to upgrade blades leading to improved aerodynamic efficiency

Benefits

  • Reduced cost and travel risk through supply of local labour
  • Improved productivity through site- based training using a specialised blade supervisor
  • Improved client responsiveness using local management
  • Improved HSEQ performance through on the job training and pre-mobilisation briefing

Challenge

  • Vestas is a key strategic client who require a range of ad-hoc services to support their service operations. A programme of blade upgrades using innovative serration, gurney flap and vortex generator technologies required additional labour at a remote wind farm containing 111 wind turbines 260km east of Perth WA
  • Our client had a demand for a low-cost resource solution which could deliver services to the required standard
  • Local and international Covid 19 restrictions had to be navigated to get the technicians to site as efficiently and cost effectively as possible
  • Experience in blade maintenance using rope access technicians was necessary to deliver the service.

Summary

  • Alpha, as a strategic global partner to Vestas, has a track record in supplying labour to meet operational demands
  • At Collgar wind farm we supplied a blended team made from local technicians and travelling technicians from Europe to train and supervise site activity
  • Our local office in Perth WA provided full logistics and HSEQ support ensuring all PPE, vehicles and supporting equipment was available prior to mobilisation
  • Our global team based in Struer Denmark, provided overall management and technical support with assignment of a highly experienced technician familiar with the specific upgrades
  • Our local team managed daily administration and operations support adding additional resource and field break replacements to ensure all client demands were satisfied.